Our structural department operates from a 10 bay workshop serviced by gantry cranes. Guillotining and pressing up to 3 meters by 12 mm is carried out in-house. Our team of certified welders and engineers can handle up to 80 tonnes of fabricated steelwork per month. ISO 9001: 2008 Quality Assurance procedures and processes ensure the job is done right the first time further enhancing customer satisfaction.


Client: McDonald's Lime Ltd
Duration: 5 Months

This contract involved the supply, fabrication, painting and erection of McDonald's Lime No 1 Lime hopper and support steel. The hopper was approximately 4m wide x 7m long and 10m high and weighed approximately 18 tonne. It was fabricated and transported to site in one piece and erected using both 80 tonne and 30 tonne cranes.

 